The Beja Solar PV (SPV) farm, located in the council and district of Beja, is sited in the Santa Clara de Louredo parish and started its operation at the end of 2023. The energy generated is fed into the grid line BJ15-41, SE Beja - Albernoa, via a mixed 15 (30)-kV interconnection line.